And a crane that won't fail proof-load. HEFT supplies the spreader beams, slings, water bag testing and Form-11 paperwork that refinery turnarounds and oil & gas EPCs need. Mobilised in days, not weeks.
Refinery overhauls and turnarounds run on a clock measured in millions per day of downtime. The catalyst regenerator goes back in this weekend, the splitter column was supposed to be lifted yesterday, and the EPC inspector is asking for the Form-11 certificate before the crane will sign on.
HEFT's spreader beam family covers refinery column erection, transformer placement, reactor setdown, modular skid handling, and NTPC / state utility lifts. Every beam ships with proof-load test certificate, MTC for primary load-bearing members, and engineering calc pack with sling angle envelope.
Crane testing on site, inspection of every sling and shackle in your rigging gear, statutory Form-11 issuance — under one Competent Person, one quality system, one number to call.
Talk to our oil & gas project lead. We'll come back within 24 hours with a scope, a cost and a paperwork plan.
Talk to project lead →